25 stills and a 3D floor plan, checked against the plan set six times. Here is what those checks caught and how each was fixed, next to the sheet that showed what belonged there.
- fixes
- 93
- images
- 26
- checks
- 6
- plan sheets
- 7
How each check reads an image
For each image: the camera's view drawn on the floor plan, then every wall in the image, left to right, against the sheets. Every window and door, which way each door swings, every fixture, what shows through each opening. Then the same room across every image that shows it.
Renders are a representation, not a measured drawing. The plans and the selections are what get built.
Checked against
- A2.1 · floor plan
- A2.2 · interior elevations
- A2.3 · door and window schedules, key plans
- A3.1 · front, courtyard and north elevations
- A3.2 · back elevation
- A3.3 · 3D views
- Site plan
Show
Check 1 of 6 · October 7–9
The 3D floor plan
Every version of the 3D floor plan, room by room, against the floor plan and the door and window schedule, before a single room was rendered from it.
21 fixes
00 · 3D floor plan · Kitchens, baths and built-ins
The laundry had tall open shelves along its long wall, and no counter or sink.
- The plan
- A2.1 draws a run of base cabinets under a counter there, with the sink at its end, next to the washer and dryer.
- The fix
- Redrawn in the next version with the counter and sink. When a later version lost the sink, I put it back in pixels.
00 · 3D floor plan · Rooms and walls
The pantry was drawn as a clothes closet: a rod of hanging clothes, on carpet.
- The plan
- A2.1 makes it the walk-in pantry off the kitchen, with a plank floor.
- The fix
- Redrawn as a pantry, but with shelves across its doorway and a block of them in the middle of the room. I rebuilt it in pixels: shelves along three walls, planks running the way the plan draws them, and the door hung on its north jamb.
00 · 3D floor plan · Kitchens, baths and built-ins
Bath 2 had no toilet: a second sink stood where it goes, past the inner door.
- The plan
- A2.1 puts the toilet there, its tank against the side wall and its bowl facing into the room.
- The fix
- Redrawn with a toilet in the next version, but facing the tub. I turned it in pixels, tank to the side wall.
00 · 3D floor plan · Furniture
Five more chairs lined the island's sink side, ten seats in all.
- The plan
- A2.1 has five stools, all on the living room side; the sink side faces the range.
- The fix
- Redrawn in the next version, which was furnished one room at a time, each room checked against the plan.
00 · 3D floor plan · Outside
The courtyard gate was drawn as a curved wall.
- The plan
- A2.1 draws a wrought-iron double gate there, between the garage's corner and bedroom 4.
- The fix
- The next version left it out and the one after put it at the outer edge of the paving, so I drew it in pixels where the plan has it: a closed iron gate between two stone posts.
00 · 3D floor plan · Furniture
Bedroom 4 had no dresser.
- The plan
- A2.1 draws one on the wall across from the bed.
- The fix
- Redrawn in the next version, which was furnished one room at a time, each room checked against the plan.
00 · 3D floor plan · Furniture
No TV on the living room's wall.
- The plan
- A2.1 draws the TV and its console on that wall, centered on the seating.
- The fix
- Fixed in pixels: the TV on the wall, over a low wood console.
00 · 3D floor plan · Furniture
Four stools at the island.
- The plan
- A2.1 has five.
- The fix
- Fixed in pixels: a fifth stool, the five evenly spaced.
00 · 3D floor plan · Furniture
Eight chairs at the dining table.
- The plan
- A2.1 has six: two on each side and one at each end.
- The fix
- Fixed in pixels: the middle chair on each long side taken out.
00 · 3D floor plan · Kitchens, baths and built-ins
The primary bath's walk-in shower was an empty room.
- The plan
- A2.1 draws a doorless 4-ft shower there, with its controls and a shampoo niche on the right-hand wall.
- The fix
- Fixed in a small image edit of that one room.
00 · 3D floor plan · Kitchens, baths and built-ins
The primary bath's toilet room had a teal glass panel where its door goes, and the tub was built in, with another glass panel beside it.
- The plan
- A2.1 gives the toilet room a door (6A) and draws a freestanding tub in the niche.
- The fix
- A small image edit made the tub freestanding. I drew the door, closed, and took out the glass in pixels.
00 · 3D floor plan · Kitchens, baths and built-ins
The covered garden's fireplace was a small white box.
- The plan
- A2.1 draws a 4-ft direct-vent fireplace against the bedroom wall.
- The fix
- A small image edit built one at the garden's open edge, facing away. I moved it onto the bedroom wall in pixels and turned the chairs to face it.
00 · 3D floor plan · Windows
A door at the east end of the primary bedroom's garden wall.
- The plan
- The door and window schedule (A2.3, the newest sheet) makes it a window, W12.
- The fix
- A small image edit made it a window, but in the middle of the wall. I moved it to the east end in pixels.
00 · 3D floor plan · Windows
An extra window in bedroom 3's south wall.
- The plan
- A2.1 has solid wall there; the room's window is in its east wall.
- The fix
- Fixed in a small image edit of that one room.
00 · 3D floor plan · Kitchens, baths and built-ins
No washer and dryer in the laundry.
- The plan
- A2.1 puts them side by side at the end of the counter.
- The fix
- Fixed in a small image edit of that one room.
00 · 3D floor plan · Kitchens, baths and built-ins
A sink stood in the mechanical room's corner, where the water heater goes.
- The plan
- A2.1 puts a 40-gallon water heater in that corner.
- The fix
- A small image edit put the heater in the pool bath's shower instead. I moved it to this corner in pixels and put the shower back.
00 · 3D floor plan · Kitchens, baths and built-ins
A sink and a toilet stood in the primary walk-in closet.
- The plan
- A2.1: a carpeted walk-in closet, with shelves and poles along its walls.
- The fix
- Fixed in pixels: the room cleared, and rods of clothes along both sides.
00 · 3D floor plan · Furniture
The primary bed was about 14 ft long.
- The plan
- A2.1 draws a California king against the east wall, between two nightstands.
- The fix
- Fixed in pixels: a California-king-size bed between its nightstands, on a rug.
00 · 3D floor plan · Furniture
Bedroom 3's bed was a melted shape.
- The plan
- A2.1 draws a queen bed against the south wall.
- The fix
- Fixed in pixels: a crisp queen bed in its place, between the nightstands.
00 · 3D floor plan · Furniture
Bedroom 2's dresser was a melted white shape.
- The plan
- A2.1 draws a dresser on the wall across from the bed.
- The fix
- Fixed in pixels: a crisp dresser in its place.
00 · 3D floor plan · Doors
The garage's big east door was drawn bowed and leaning.
- The plan
- A2.1 draws the garage's east wall straight, with a 16-ft overhead door in it.
- The fix
- Fixed in pixels: the door redrawn straight.
Check 2 of 6 · October 7–10
Each image as it came back
Each image against its camera's view drawn on the floor plan, the elevations and the images already approved, and again after every correction.
16 fixes
01 · Front from the corner · Outside
The entry tower had flat sides and corners.
- The plan
- The tower is round: a 12'-6" circle on the roof framing plan, and a smooth stucco cylinder in both 3D views (A3.3).
- The fix
- A small image edit, merged in only where it changed: a round stucco tower with a round tile roof.
02 · Front straight on · Outside
The tower was stacked stone, with flat sides.
- The plan
- The front elevation (A3.1) draws the tower in stucco, like every stucco wall; stone only on the front gable, the gate's pilasters and the low walls. The 3D views (A3.3) make it round.
- The fix
- A small image edit: a smooth, round cream-stucco tower.
02 · Front straight on · Outside
The tower fix also took away the small tile roof over the gate, so the gate looked set into the tower's base.
- The plan
- The front elevation (A3.1) has a small tile roof over the gate, with the tower behind it.
- The fix
- Fixed in pixels: the gate's roof put back from the first version.
05 · Great room toward the patio · Furniture
Two swivel chairs stood under the right-hand window.
- The plan
- A2.1 puts the second sofa there, under the window and facing into the room.
- The fix
- A small image edit, merged in only where it changed.
06 · Primary bath · Windows
The bath's two windows had white frames.
- The plan
- Every other window in the house has black frames, as in the approved kitchen photo.
- The fix
- A small image edit, merged in only where it changed: both frames black.
10 · Covered back patio · Outside
At the far end, a wall closed off the patio, with a narrow window and a tall glass door in it.
- The plan
- On A2.1 the patio is open at that end: the house wall runs on to its corner beside the last post, with a window, the sliding door and a window along it.
- The fix
- Two small image edits, each merged in only where it changed: first a window in place of the door, then the far end opened up.
13 · Entry rotunda · Rooms and walls
Wood beams crossed the great room's ceiling, seen through the arch.
- The plan
- A2.1 notes a flat 12-ft ceiling in the great room, and the approved photos (04, 05) have no beams.
- The fix
- A small image edit, merged in only where it changed.
15 · Great room overview · Rooms and walls
Wood beams crossed the ceiling, and the kitchen wasn't the approved kitchen: open shelves beside the hood, two cream pendants, and no small windows high on the wall.
- The plan
- A2.1 notes a flat 12-ft ceiling. The approved kitchen photo (04) has upper cabinets either side of the hood, three brass pendants, and small square windows above the cabinets, as A2.2's kitchen wall 3 draws them.
- The fix
- Three small image edits; the photo was later re-rendered with all of it kept.
16 · Great room toward the TV wall · Windows
The back wall was one long wall of glass.
- The plan
- A2.2's great room wall 4: a window, the sliding door and a window, with wall between them and two small square windows above each.
- The fix
- A small image edit, merged in only where it changed.
16 · Great room toward the TV wall · Rooms and walls
Wood beams crossed the ceiling, and cream pendants hung over the island.
- The plan
- A2.1 notes a flat 12-ft ceiling, and the approved kitchen photo (04) has three brass pendants.
- The fix
- A small image edit, merged in only where it changed.
16 · Great room toward the TV wall · Kitchens, baths and built-ins
The island ran away from the camera, its stools facing the dining table.
- The plan
- On A2.1 its long sink side faces this corner and its five stools are on the far side, facing the living room, as in 04, 05 and 15.
- The fix
- A small image edit, merged in only where it changed.
18 · Primary bedroom toward the fireplace · Outside
Through the windows: stone arches and columns, where the garden is plain stucco with the jasmine trellis on its east wall.
- The plan
- The garden photo (11) shows its walls, the trellis and the chairs.
- The fix
- A small image edit showed the garden, with the trellis in the wrong window, so I swapped the two windows' views in pixels. The photo's later re-render keeps the trellis on the right.
20 · Hall · Rooms and walls
Two arches crossed the hall, with both courtyard windows bunched before them and two doors at the end.
- The plan
- A2.1 has three arched openings dividing the hall into bays, a courtyard window in each of the first two, and one door at the far end.
- The fix
- Re-rendered from a corrected prompt.
24 · Bath 2 · Kitchens, baths and built-ins
The toilet stood in a nook in the front part of the bath, beside the vanity, and there was no window over the tub.
- The plan
- A2.1 puts the toilet in the back part, past the inner door, with the tub, and a window over the tub.
- The fix
- A small image edit, merged in only where it changed, took out the toilet and its nook and added the window; the next fix set the toilet in the back part.
25 · Powder room · Kitchens, baths and built-ins
The toilet faced the door, its tank against the far wall.
- The plan
- On A2.1 its tank is against the right-hand wall and its bowl points toward the sink.
- The fix
- A small image edit, merged in only where it changed.
26 · Laundry · Kitchens, baths and built-ins
The sink was at the near end of the counter.
- The plan
- A2.1 puts it at the far end, next to the washer and dryer.
- The fix
- A small image edit, merged in only where it changed.
Check 3 of 6 · October 10
Every image, against every sheet
Every image again, against the whole plan set: the floor plan with each camera's view drawn on it, the interior elevations, the door and window schedules, the exterior elevations and the 3D views.
3 fixes
14 · Rotunda, looking up · Rooms and walls
Wood ceiling beams showed through the arch to the hall.
- The plan
- A2.1 notes a flat 9-ft ceiling in the hall, as 20 shows it.
- The fix
- Fixed in pixels: the beams painted out.
24 · Bath 2 · Doors
The inner door swung out toward the camera, and no toilet showed through the doorway.
- The plan
- On A2.1 that door swings into the back part, which holds the toilet and the tub together: the toilet just inside on the right, the tub across the far wall.
- The fix
- A small image edit, merged in only where it changed.
24 · Bath 2 · Kitchens, baths and built-ins
The door fix left a grey smear on the toilet's base, where it meets the door frame.
- The plan
- The base is plain white porcelain, like the rest of the toilet.
- The fix
- Fixed in pixels: each row of the smear repainted from the porcelain beside it.
Check 4 of 6 · October 11
The doors around the great room
Every door around the great room against the floor plan, the great room's elevation and the door schedule, with what each camera sees through the entry's arch worked out from the arch's jambs.
2 fixes
16 · Great room toward the TV wall · Doors
No door at the right end of the TV wall: the wall ran straight into the entry's arch.
- The plan
- A2.2's great room wall 1 ends in door 3, the primary bedroom's round-top door, just before the entry's curved wall; A2.1 draws it there, and 15 shows it.
- The fix
- A small image edit, merged in only where it changed.
17 · Primary bedroom · Doors
The bedroom's entry door, door 3, was drawn square-topped, where the great room shows it with a round top.
- The plan
- The door schedule (A2.3) makes doors 1, 2 and 3 one round-top type.
- The fix
- A small image edit, merged in only where it changed.
Check 5 of 6 · October 11–12
Every image, wall by wall
Every image and the 3D floor plan again, each wall left to right against every sheet and against the other images of the same room. Each finding was checked against the sheets before it was fixed.
39 fixes
13 · Entry rotunda · Windows
Four small windows sat high on the curved wall ahead.
- The plan
- The rotunda key plan (A2.3) puts all five of the tower's windows on the courtyard half, behind this camera, so this side is plain plaster.
- The fix
- A small image edit, merged in only where it changed.
13 · Entry rotunda · Rooms and walls
Through the arch on the left, a hallway ran on to an open door and a bedroom.
- The plan
- From here, A2.1 has the hall's plain end wall a few feet behind that arch; the hall turns away, out of view.
- The fix
- A small image edit, merged in only where it changed.
13 · Entry rotunda · Doors
The garage door at the right edge had its knob and lock plate on its hinge side.
- The plan
- A2.1 hinges that door (door 2) on the edge that shows here; its knob is on the far edge, out of view.
- The fix
- A small image edit, merged in only where it changed.
13 · Entry rotunda · Rooms and walls
Through the big arch was a different room: a wall of glass with stone piers and a valley outside, a dining table under a chandelier, and the kitchen.
- The plan
- From here A2.1 has the back wall's sliding door and window, each with two small windows above, and the seating in front; the dining area and kitchen are hidden behind the round wall.
- The fix
- A small image edit, merged in only where it changed.
14 · Rotunda, looking up · Doors
On the left, an open arch into a lit room, where the garage door is.
- The plan
- Looking up with the front door at the bottom, the left side is north: A2.1 puts the round-top wood door to the garage there, closed, the door 16 shows through the arch.
- The fix
- A small image edit, merged in only where it changed.
14 · Rotunda, looking up · Doors
The front door at the bottom read as a pair of doors, with a hinge showing on each edge.
- The plan
- The entry is one round-top door (A2.3), and A2.1 hangs it on its north jamb, which is its left edge from here; 08 and 13 show it as one door.
- The fix
- A small image edit, then I took the right-hand hinge off in pixels, so it hangs from one edge.
14 · Rotunda, looking up · Kitchens, baths and built-ins
The chandelier had two tiers of candles.
- The plan
- 13, 15 and 16 show the same chandelier with one ring.
- The fix
- A small image edit, merged in only where it changed.
03 · Back · Outside
A square stone tower with its own tile roof stood against the house at its right end.
- The plan
- It's the development's entry monument at the far street corner, labeled on the front 3D view (A3.3). The back elevation draws it beside the house only because an elevation is flat.
- The fix
- A small image edit took it out, and the photo's later re-render leaves it out too.
03 · Back · Outside
The solar row had 13 panels of uneven width, one oversized, and a see-through half panel at its right end.
- The plan
- The back elevation (A3.2) and the back 3D view (A3.3) draw 15 even panels.
- The fix
- Fixed in pixels: 15 even panels. The photo's later re-render has 15 too.
08 · Courtyard toward the front door · Windows
The hall's two courtyard windows ran from near the ground almost to the eave, and a sliver of a third opening showed by the tower.
- The plan
- The schedule (A2.3) makes them 2'-6" x 5'-0" casements; the courtyard elevation (A3.1) puts their sills 3 ft up. A2.1 has solid wall by the tower.
- The fix
- A small image edit, merged in only where it changed.
09 · Courtyard toward the gate · Windows
The same two windows, seen from the other end, ran almost from the planting bed to the eave.
- The plan
- 2'-6" x 5'-0" casements (A2.3), their sills 3 ft up (A3.1).
- The fix
- A small image edit, merged in only where it changed.
20 · Hall · Windows
Inside, the same two windows ran from the floor almost to the ceiling, and a third, narrow one stood past the third arch.
- The plan
- 2'-6" x 5'-0" casements with 3-ft sills (A2.3, A3.1), and only these two: past the third arch, A2.1 has solid wall.
- The fix
- A small image edit, merged in only where it changed.
04 · Kitchen and dining · Doors
At the far left, a black-framed glass door looked out to a garden.
- The plan
- That wall is inside the house: A2.2's kitchen wall 2 and A2.1 put the white pantry door there.
- The fix
- A small image edit, merged in only where it changed.
04 · Kitchen and dining · Windows
At the far right, past the stone wall, a plain opening ran down to the floor.
- The plan
- The back wall has a window there (A2.2's great room wall 4); 05 and 16 show it.
- The fix
- A small image edit, merged in only where it changed.
04 · Kitchen and dining · Kitchens, baths and built-ins
A second brass pot filler sat on the backsplash, right of the range.
- The plan
- A2.2's kitchen wall 3 has one, over the range.
- The fix
- Fixed in pixels: the tile carried across where it was.
15 · Great room overview · Kitchens, baths and built-ins
A run of floor-to-ceiling cabinets filled the kitchen's side wall, and the chimney, faucet and refrigerator weren't the approved kitchen's.
- The plan
- A2.2's kitchen wall 2: a counter with upper cabinets, the oven and microwave tower, then the pantry door beside the refrigerator. The approved kitchen (04) has a plaster chimney, a brass faucet and a dispenser on the refrigerator.
- The fix
- A small image edit; the photo was later re-rendered with it right.
16 · Great room toward the TV wall · Rooms and walls
A lowered band of ceiling ran along the TV wall.
- The plan
- A2.1 notes one flat 12-ft ceiling in the great room, as 05 and 15 show it.
- The fix
- A small image edit, merged in only where it changed.
16 · Great room toward the TV wall · Windows
Over the back wall's openings, the small windows were drawn as continuous rows of glass; the near window had a horizontal bar, and the posts outside read pale and stony.
- The plan
- A2.2's great room wall 4 and 05 have two separate small square windows over each opening and a plain two-panel slider; 03 and 05 show stained-wood posts.
- The fix
- A small image edit, merged in only where it changed.
16 · Great room toward the TV wall · Kitchens, baths and built-ins
The island's faucet was black, and a tall cabinet door stood at the right edge.
- The plan
- The approved kitchen (04) has a brass faucet, and its counters have upper cabinets over them, as the kitchen's elevations (A2.2) draw them.
- The fix
- A small image edit, merged in only where it changed.
10 · Covered back patio · Windows
The wall above the sliding door and the far window was plain.
- The plan
- A2.1 and A2.2's great room wall 4 put two small square windows high over each opening, six in all; 05 shows them from inside.
- The fix
- A small image edit, merged in only where it changed.
17 · Primary bedroom · Outside
Through the window: a stone pillar, trees and open sky.
- The plan
- That window looks into the covered garden's corner, onto the stucco wall a few feet away where 11 shows the jasmine trellis.
- The fix
- A small image edit, merged in only where it changed.
17 · Primary bedroom · Windows
The edit that fixed the view dropped the window's upright bar, leaving two panes.
- The plan
- The same window shows four panes in 11 and 18.
- The fix
- Fixed in pixels: the upright put back from the first version.
18 · Primary bedroom toward the fireplace · Outside
Through the window, the garden ended in a round arch.
- The plan
- The north elevation (A3.1) draws the garden's open side as one wide flat-topped opening, under its flat ceiling.
- The fix
- A small image edit; the photo was later re-rendered with it right.
11 · Primary suite garden · Windows
Through the window, a bed faced the garden, its headboard on the far wall; and the window had two panes where 17 and 18 show four.
- The plan
- A2.1 puts the headboard on the bedroom's east wall, so from here the bed is seen from its side.
- The fix
- A small image edit; the photo was later re-rendered with it right.
11 · Primary suite garden · Outside
Open sky showed over the trellis.
- The plan
- A2.1 notes a covered private garden with a 9-ft ceiling, so the trellis stands on a stucco wall under it.
- The fix
- A small image edit; the photo was later re-rendered with it right.
19 · Primary walk-in closet · Rooms and walls
The closet was drawn about twice as deep as it is, with a bench in the middle.
- The plan
- A2.1: 7'-1" wide and 6'-0" deep from the arched opening, so the back wall fills most of the photo.
- The fix
- A small image edit of the whole photo.
06 · Primary bath · Doors
The toilet room's door was hung on the right, opening toward the bath, its hinges showing.
- The plan
- A2.1 hangs door 6A on its south jamb, swinging into the toilet room: from the bath, its lever is on the right and no hinges show.
- The fix
- Fixed in pixels: the door mirrored, the hinges taken out and the latch moved.
15 · Great room overview · Doors
Through the arch, the front door was hung the wrong way round: lever on the left, hinges on the right.
- The plan
- A2.1 hangs door 1 on its north jamb, swinging into the rotunda: from here, hinges on the left and the lever on the right.
- The fix
- Fixed in pixels: the door mirrored. The photo's later re-render hung it wrong again, so I mirrored that one too.
16 · Great room toward the TV wall · Doors
Through the arch, the garage door had its lever on the left and its hinges on the right.
- The plan
- A2.1 hangs door 2 on its west jamb, swinging into the garage: from here, the lever on the right and no hinges showing.
- The fix
- Fixed in pixels: the door mirrored and the hinges taken out.
01 · Front from the corner · Outside
Left of the iron gate, the stone gable's side wall was cream stucco with a small window and a tan recess.
- The plan
- The front 3D view (A3.3), the front elevation (A3.1) and A2.1 have it blank, faced in the same stacked stone.
- The fix
- A small image edit got the stone but came back soft, so I rebuilt the wall in pixels from the gable's own stone, keeping the tree, plants and gate in front.
00 · 3D floor plan · Doors
A door stood in the TV wall, about 3 ft west of the bedroom door.
- The plan
- A2.1 has solid wall there.
- The fix
- Fixed in pixels: the wall carried across.
00 · 3D floor plan · Doors
The rotunda's west arch had a door leaf and a rod across it.
- The plan
- A2.1 draws an open arched opening there, as 13, 15 and 16 show it.
- The fix
- Fixed in pixels: both taken out.
00 · 3D floor plan · Doors
The mechanical room's door had a second leaf, swung out into the room from the other jamb.
- The plan
- A2.1 draws one leaf (7A), open flat against the east wall.
- The fix
- Fixed in pixels: the second leaf taken out.
00 · 3D floor plan · Doors
The door from the rotunda to the garage hung on its east jamb.
- The plan
- A2.1 hangs door 2 on its west jamb.
- The fix
- Fixed in pixels: the leaf mirrored, its knob moved to the free end.
00 · 3D floor plan · Doors
Bedroom 2's door hung on its west jamb.
- The plan
- A2.1 hangs it (18F) on its east jamb.
- The fix
- Fixed in pixels: the leaf mirrored.
00 · 3D floor plan · Doors
Bath 2's inner door had no leaf.
- The plan
- A2.1 draws one (17E), hinged on its east jamb.
- The fix
- Fixed in pixels: bath 2's own door, scaled to the opening.
00 · 3D floor plan · Doors
The laundry door had no leaf.
- The plan
- A2.1 draws one (door 20), swinging into the laundry.
- The fix
- Fixed in pixels: bath 2's door, scaled to the opening.
00 · 3D floor plan · Doors
The garage's side door was a garbled pair of leaves.
- The plan
- A2.1 draws one door (9C), hinged on its west jamb and swinging out onto the landing.
- The fix
- Fixed in pixels: one leaf, hung that way.
00 · 3D floor plan · Doors
A door stood in the garage's south wall.
- The plan
- A2.1 has solid wall there.
- The fix
- Fixed in pixels: the wall carried across.
Check 6 of 6 · October 20
Could it be built, and would it work?
Every image again for physical sense alone: every door can swing, nothing runs into anything, counters end properly, sizes agree, and every item labelled on the plan is where it's drawn. Part by part, at twice the size.
12 fixes
26 · Laundry · Could it be built?
The ironing board stood open right inside the door, its cabinet door lying flat on the wall beside its own opening, hinged where it couldn't swing.
- The plan
- A2.1 labels it farther down the same wall, across from the washer.
- The fix
- Fixed in pixels: the board taken out, and a closed cabinet set flush in the wall where the plan has it.
26 · Laundry · Could it be built?
One drawer front had no pull, so it couldn't be opened.
- The plan
- A drawer needs a pull, like every other drawer in the run.
- The fix
- Fixed in pixels: a pull from the drawer stack, fitted to that drawer.
14 · Rotunda, looking up · Could it be built?
The garage door showed a hinge on the rotunda side, as if it swung into the entry, where it would sweep the front door's corner.
- The plan
- A2.1 hangs door 2 on its west jamb, swinging north into the garage, so no hinge shows from the rotunda.
- The fix
- Fixed in pixels: the hinge taken off, the door's edge carried through.
15 · Great room overview · Could it be built?
The pantry door's lever was on its hinge edge, hard against the oven tower.
- The plan
- A2.2's kitchen wall 2 hinges the pantry door (23) on its left, beside the oven tower, so its lever belongs on the right edge.
- The fix
- Fixed in pixels: the lever moved to the free edge.
15 · Great room overview · Could it be built?
Over the counter, the middle upper door had a pull on both edges, so it couldn't be hinged on either.
- The plan
- A2.2's kitchen wall 2 draws a single door, a pair and a single there: one pull to a door, on its opening edge.
- The fix
- Fixed in pixels: the extra pull painted out.
20 · Hall · Kitchens, baths and built-ins
Two lanterns hung one right under the other, reading as one two-tier fixture.
- The plan
- The hall has three bays between its arches (A2.1), with one lantern in each.
- The fix
- Fixed in pixels: the extra lantern taken out.
20 · Hall · Doors
The laundry door showed its hinges from the hall, as if it swung out into the hall.
- The plan
- A2.1 swings it into the laundry, and 26 shows it standing open inside; from the hall no hinges show.
- The fix
- Fixed in pixels: the hinges taken off.
26 · Laundry · Could it be built?
At the far end of the counter, the washer's top ran into a raised ledge, the sink was a thin slot squeezed against the washer, and a plant sat on the washer.
- The plan
- A2.1 sets the sink into the counter near its end, with the counter stopping where the washer and dryer begin.
- The fix
- A small image edit, merged in only where it changed: one flat counter with the sink set into it and an end panel just before the washer.
18 · Primary bedroom toward the fireplace · Could it be built?
The armchair and its side table stood right in front of the garden door, which swings into the room: it couldn't open.
- The plan
- On A2.1 that door swings in from its west jamb, its leaf ending against the west wall, and the armchair sits in the corner by the closets.
- The fix
- A small image edit, merged in only where it changed: the chair and table moved onto the wall between the door and the window.
17 · Primary bedroom · Could it be built?
The right nightstand stood in the arched door's swing: the door would hit it after opening about 20 degrees.
- The plan
- On A2.1 the California king and its nightstands, about 9 ft across in all, are centered on the far wall, with the door's swing beside them; in the photo they were about 12 ft.
- The fix
- A small image edit, merged in only where it changed: the bed group narrowed, so the door opens most of the way.
10 · Covered back patio · Could it be built?
The sliding door had two pulls facing each other where its panels meet, like a pair of French doors.
- The plan
- The back elevation (A3.2) marks the near panel as the one that slides. Only it gets a pull, on its outer edge; a pull in the middle would hit the other panel.
- The fix
- A small image edit, merged in only where it changed: one pull, at the sliding panel's outer edge.
11 · Primary suite garden · Could it be built?
The big potted olive stood in front of the garden door, so the door couldn't open.
- The plan
- On A2.1 the door sits about 2 ft from the fireplace and opens into the bedroom, so its doorway has to stay clear.
- The fix
- A small image edit, merged in only where it changed: the pot moved into the corner.
If a render doesn't match your plans, I fix it free. You approve the stills before you pay the rest.
Free consultation
Let’s go through your plans.